Seal coating procedures
Crack filling, Sealcoating and Line Marking No asphalt product is indestructible or maintenance free. S&S Paving will provide you with a maintenance program suited for your needs, but we suggest at least the following be done:
- Apply a professional seal coat. This application will give your paved area a rich, uniform color. It will add to the beauty of your property and protect the surface against heat, water, ice, cold, salt and oils, ensuring a longer life cycle.
- Our sealing product is Sealmaster Coal Tar, a concentrated refined coal tar emulsion specifically formulated as a weather protecting, gas and oil resistant coating over asphalt. This product protects pavements from the destructive effects of water, sunlight, oxidation, gasoline, motor oil, and many other chemicals and solvents. It also extends the service life and reduces maintenance costs of off-street asphalt pavements.
- A two coat application of sealer will be applied by a professional crew with over 10 years’ experience. All work will be done neatly and cleanly at all times with a minimum of traffic disruption.
Before & after crack treatment
Sealmaster product details
Description SealMaster® Coal Tar Sealer is a coal tar emulsion sealer designed to protect and beautify asphalt pavement surfaces.
Advantages• Deep, Rich Black Color
• Oil and Fuel Resistant
• Reduced Fume Formulation For User Friendly Application
Surface PreparationNew asphalt surfaces must cure a minimum of four weeks under ideal weather conditions before application. Surface must be clean and free from all loose material, dirt, and dust. Cracks should be filled with SealMaster® Hot Pour or Cold Applied crack fillers. Treat all grease, oil, and gasoline stains with SealMaster® Petro Seal or Prep Seal.
ApplicationTwo coats of mixed material are recommended. Apply by squeegee, brush, or spray. Allow a minimum of 2 to 4 hours drying time before applying second coat. Allow 24 hours before parking cars or allowing traffic to resume.
ImportantTemperatures must be above 50°F both during application and for aperiod of at least 24 hours after application. Do not apply when rain is imminent or forecast.
Clean Up Wash tools in water before material dries.
Advantages• Deep, Rich Black Color
• Oil and Fuel Resistant
• Reduced Fume Formulation For User Friendly Application
Surface PreparationNew asphalt surfaces must cure a minimum of four weeks under ideal weather conditions before application. Surface must be clean and free from all loose material, dirt, and dust. Cracks should be filled with SealMaster® Hot Pour or Cold Applied crack fillers. Treat all grease, oil, and gasoline stains with SealMaster® Petro Seal or Prep Seal.
ApplicationTwo coats of mixed material are recommended. Apply by squeegee, brush, or spray. Allow a minimum of 2 to 4 hours drying time before applying second coat. Allow 24 hours before parking cars or allowing traffic to resume.
ImportantTemperatures must be above 50°F both during application and for aperiod of at least 24 hours after application. Do not apply when rain is imminent or forecast.
Clean Up Wash tools in water before material dries.